| Name | Size | Modified | ||
|---|---|---|---|---|
| Go up | — | — | ||
| 1.Material/ | — | — | ||
| 10. Primer mixing/ | — | — | ||
| 11. applying primer/ | — | — | ||
| 12. specimen setting after primer/ | — | — | ||
| 13. adhesive mixing/ | — | — | ||
| 14. applying adhesive/ | — | — | ||
| 15. CFRP Cutting/ | — | — | ||
| 16. CFRP wrapping/ | — | — | ||
| 2. General/ | — | — | ||
| 3.Humid/ | — | — | ||
| 4. Rainwater/ | — | — | ||
| 5. Salt water/ | — | — | ||
| 6. smoothing/ | — | — | ||
| 7. cutting/ | — | — | ||
| 8. surface brushing/ | — | — | ||
| 9.1 Mixing putty/ | — | — | ||
| 9.2 applying putty/ | — | — | ||
| 9.3 Crack and putty comparison/ | — | — | ||
| 9.4 Cracked specimen/ | — | — | ||
| INdividual specimen/ | — | — | ||
| Setup/ | — | — |